In Six and a Half Years, Only 11 km out of 28 km Wire Stretch has been Completed
Kathmandu; The construction of the 28 km long Chilime-Trishuli 220 kV transmission line was started over six years ago, but only 11 km of the wire has been laid so far showing the cause of the geographical difficulty. Targeting to evacuate electricity produced by the hydropower projects to be developed in the upper region of the Trishuli River C...
27 March, 2024
