Energy Update

  • NEA : 8221 MWh
  • Subsidiary Company : 3776 MWh
  • Private Sector : 14182 MWh
  • Import : 8409 MWh
  • Tripping : 3190 MWh
  • Energy Demand : 37778 MWh
  • NEA : 0 MW
  • Subsidiary Company : 0 MW
  • Private Sector : 0 MW
  • Import : 0 MW
  • Tripping : 0 MW
  • Peak Demand : 1818 MW
2024 April 26,Friday
×

BAHAS

Hydropower leaves cracked houses across Bhutan

The pandemic may have shut down much of Bhutan’s public life, but its prime export, hydropower, has flourished. With early rainfall, Druk Green Power Corporation has recorded an estimated 14% increase in energy generation between January and July end, compared to the same months in 2019. Revenues increased 13%. The rise in revenues wi...

18 January, 2021
  • Info. Dept. Reg. No. : 254/073/74
  • Telephone : +९७७-१-५३२१३०३
  • Email : [email protected]
© 2024 Urja Khabar. All rights reserved
Contact for advertisement +९७७-१-५३२१३०३
Design By : Nectar Digit