Energy Update
NEA :
7217
MWh
Subsidiary Company :
13002
MWh
Private Sector :
47284
MWh
Import :
67
MWh
Tripping :
0
MWh
Energy Demand :
67570
MWh
NEA :
0
MW
Subsidiary Company :
0
MW
Private Sector :
0
MW
Import :
0
MW
Tripping :
0
MW
Peak Demand :
2995
MW
Publication
E- Paper
NP
2026 September 20,Sunday
Hydropower
Solar
Wind
Biogas
Transmission
Petroleum
International
Water Resource
Climate
Green Hydrogen
EV
Renewable Energy
Latest News
11 Bodies Recovered from Upper Trishuli-1 Tunnel on Saturday
Nepal’s GLOF Risk Raises Alarm for India’s Northeast: Prof. Lama
LPG Bottlers Pledge Normal Supply as Prithvi Highway Reopens
Gharapjhong Climate Convention Calls for Himalayan Climate Justice
IPPAN Urges Special Status for Flood-Hit Hydropower Projects
Strengthening Safety and Security of Nepal’s Hydropower Stations
Publication
E- Paper
NP
Search
×
hydropower
solar
wind
Biogas
Transmission
petroleum
International
Climate
Trend
Upper Trishuli-1: A game-changer hydro project that will add Rs 80 billion to the state coffer
Nepal’s GLOF Risk Raises Alarm for India’s Northeast: Prof. Lama
NEWS
11 Bodies Recovered from Upper Trishuli-1 Tunnel on Saturday
Kathmandu:
19 September, 2026
LPG Bottlers Pledge Normal Supply as Prithvi Highway Reopens
Expert Panel Formed to Probe Scientific Causes of Bhotekoshi Flood
Five Bodies Recovered from Flood-Hit Chilime Hydropower Tunnel
Bhotekoshi Flood Prompts Govt to Tighten Safety Rules for Infrastructure Projects
Rs 390.62 Billion Estimated to Rebuild Flood-Hit Energy Sector
SOPPAN Provides 1,000 Solar LED Lights for Flood Victims
Only 3 Rescued as 121 Trapped in Hydropower Tunnels
Nepal’s Power Exports to Bangladesh Put on Hold After Flood Damage
Two Rescued Safely from Devastated Upper Trishuli 3A Tunnel After 10 Days
‹
1
2
3
4
5
6
7
8
9
10
...
34
35
›
Info. Dept. Reg. No. : 254/073/74
Telephone : +977-1-5321303
Email :
[email protected]
© 2026 Urja Khabar. All rights reserved
Contact for advertisement +977-1-5321303