विद्युत अपडेट

  • प्राधिकरण : ८२२१ मे.वा.घन्टा
  • सहायक कम्पनी : ३७७६ मे.वा.घन्टा
  • निजी क्षेत्र : १४१८२ मे.वा.घन्टा
  • आयात : ८४०९ मे.वा.घन्टा
  • निर्यात : मे.वा.घन्टा
  • ट्रिपिङ : ३१९० मे.वा.घन्टा
  • ऊर्जा माग : ३७७७८ मे.वा.घन्टा
  • प्राधिकरण : मे.वा.
  • सहायक कम्पनी : मे.वा.
  • निजी क्षेत्र : मे.वा.
  • आयात : मे.वा.
  • निर्यात : मे.वा.
  • ट्रिपिङ : मे.वा.
  • उच्च माग : १८१८ मे.वा.
२०८१ ब‌ैशाख १६, आईतबार
×
जलविद्युत सोलार वायु बायोग्यास पेट्रोलियम अन्तर्राष्ट्रिय ई-पेपर जलवायु ऊर्जा दक्षता उहिलेकाे खबर ईभी सम्पादकीय बैंक पर्यटन भिडियो छापा खोज प्रोफाइल ऊर्जा विशेष ऊर्जा

Kathmandu: The private hydroelectricity developers have received permission to export 319 MW of electricity, with India recently providing approval to purchase more electricity from Nepal.

At a time when the private hydropower promoters have been pushing the government to pave the way to export electricity to India, they have received approval to export about 319 MW of electricity from the projects that they run. The private sector in this regard received approval for four projects to export electricity to India. In the new development, India has paved the way for the private sector projects to export electricity out of nine projects in total.

According to the Nepal Electricity Authority (NEA), the projects that have received approval for electricity export are Chilime (subsidiary of the NEA), Solu Khola, Kabeli B-1, Likhu-4, Lower Modi, Solu-Dudhkosi, Dordi Khola, Upper Kalanga Gad and Upper Chamelia. India’s latest move has energized the promoters and investors of the energy sector. According to them, it has ensured the market expansion for hydropower produced in Nepal.

As of now, five projects under the state-owned power utility have received approval for exporting 313 MW of electricity to India. These government run projects include Trishuli, Devighat, Marsyangdi, Kaligandaki A and Madhya Marsyangdi hydropower projects.

Out of the total of 632 MW of electricity receiving permission for export, the private sectors now have more share than that of the government run projects.

The amount of private sector electricity exported to India will increase after the Indian Cabinet meeting on Tuesday approved the electricity of four projects. Six months ago, Nepal proposed to export electricity from these projects to the southern neighbor.  

Earlier, India had approved purchasing 452 MW of electricity from Nepal by using the Dhalkebar-Muzaffarpur cross border transmission line to be sold in India's 'day ahead market.' Out of the production of four projects approved on Tuesday, 110 MW will be sold in the day ahead market, while 70 MW will be purchased by the Indian Company NVVN to be supplied to Haryana, an Indian state, by using the Tanakpur based transmission line.

According to the NEA, with the process of bilateral agreement led by its Load Dispatch Center for this process in progress, the electricity export of the approved amount (180 MW) has been started only from 12 midnight on Wednesday (September 6). The Nepal-India 10th Energy Secretary level meeting approved the capacity of 800 MW of electricity from the Dhalkebar-Muzaffarpur cross border line, out of which 562 MW has been approved. Even with the export of 110 MW of electricity approved on Tuesday, there is still 238 MW of electricity remaining to supply through this system.

Details of approved projects to export electricity to India

S.No Company Project Total Capacity Export capacity Remarks
1 NEA Trisuli 24.00 23.28  
2 NEA Devighat 14.10 14.55  
3 NEA Middle marshyagdi 70.00 68.00  
4 NEA marshyagdi 69.00 67.00  
5 NEA Kaligandaki A 144.00 140.00  
6 Chilime hydropower company chilime 22.10 21.44 IPP
7 Upper solu hydro electric company Solu khola 23.50 22.80 IPP
8 Arun kabeli power ltd Kabeli B 1 25.00 24.25 IPP
9 Green ventures pvt ltd Likhu 4 52.20 51.00 IPP
10 Modi energy ltd Lower modi 20.00 19.40 IPP
11 Sahas urja ltd solududhkoshi 86.00 83.42 IPP
12 Himalayan power partners ltd Dordi khola 27.00 26.19 IPP
13 Sanigad hydro company Upper kalanga gad 38.46   IPP
14 Api power company ltd upper chameliya 40.00   IPP

Source: Nepal Electricty Authority

The NEA started selling 39 MW of electricity in India from November 2021. In May 2022, 364 MW of electricity from six more projects were allowed to be sold in the Indian market at competitive rates.

In October 2022, two more hydropower projects were approved for export, taking the supply to 452 MW. Nepal has been waiting for India's approval to export another 750 MW of electricity from 14 projects.

प्रतिक्रिया दिनुहोस

Pushpa Koirala

© 2024 Urja Khabar. All rights reserved
विज्ञापनको लागि सम्पर्क +९७७-१-५३२१३०३
Site By : Nectar Digit